PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed shear studs throughout the 3rd Floor Facing North (800x600).jpg Installed wire mesh and rebar at the 3rd Floor (1) Facing North-East (800x600).jpg Installed wire mesh and rebar at the 3rd Floor (2) Facing North-East (800x600).jpg Installing Stair -4 (1st Floor) Facing East  (800x600).jpg Installing Stair -4 (2nd Floor) Facing East.jpg
Previous page Installing Stair -4 (2nd Floor) Facing East
Installing Stair -4 (2nd Floor) Facing East